Information contained in this page shows the status of different critical systems and infrastructure within the HPU community.
For status of Microsoft Office 365, click here.
For status of Google Apps, click here.
An electrical brown out occurred at 12:30pm in the UB building, causing a network switch to stop responding.
The affected network equipment was connected to a faulty UPS, and did not come back up after the blip.
Engineers were dispatched to reroute power to the switch, and services were restored at 1pm.